If the bridge can be opened, or is already open, when a call signal is given, the operator shall promptly answer the vessel calling by giving the acknowledging signal, and promptly open the draw (except during closed periods, see par. Port Series - Page 7by United States. Board of Engineers for Rivers and Harbors - 1932Full view - About this book
| United States. Board of Engineers for Rivers and Harbors - Harbors - 1954
...signaling for the draw to open. To bridge operators: (h) If the bridge can be opened, or is already opened, when a call signal is given, the operator shall promptly...open the draw (except during closed periods, see par. (1)) or hold it open, as the case may be. (i) In case the draw cannot be opened at once when the call... | |
| United States. Board of Engineers for Rivers and Harbors - Harbors - 1940 - 340 pages
...the draw or hold it open, as the case may be. 9. In case the draw cannot be opened at once when the call signal is given, the operator shall promptly answer the vessel calling by giving the danger singal, and shall repeat same, if necessary. As soon as the exigency which prevented opening... | |
| Maritime law - 444 pages
...par. 12) or hold it open, as the case may be. 9. In case the draw cannot be opened at once when the call signal is given, the operator shall promptly answer the vessel calling by giving the danger signal and shall repeat same, if necessary. As soon as the exigency which prevented opening... | |
| Maritime law - 1939 - 612 pages
...paragraph (1) or hold it open, as the case may be. (i) In case the draw cannot be opened at once when the call signal is given, the operator shall promptly answer the vessel calling by giving the danger signal and shall repeat same, if necessary. As soon as the exigency which prevented opening... | |
| Administrative law - 1939 - 998 pages
...paragraph (1) ) or hold it open, as the case may be. (i) In case the draw cannot be opened at once when the &M4 zv # I B! 7j H-0 xXd0 7av& []4 w Z k3( Gꊑd ؒ L &] ޝ ] N n danger signal and shall repeat same, if necessary. As soon as the exigency which prevented opening... | |
| U.S. Coast and Geodetic Survey - Pilot guides - 1943 - 440 pages
...shall lower same and pass under the bridge if practicable, without signalling for the draw to open. 25 8. If the bridge can be opened, or is already open,...hold it open, as the case may be. 9. In case the draw cannot be opened at once when the call signal is given, the operator sliall promptly anwser the vessel... | |
| United States. Board of Engineers for Rivers and Harbors - Harbors - 1945 - 182 pages
...the draw or hold it open, as the case may be. 9. In case the draw cannot be opened at once when the call signal is given, the operator shall promptly answer the vessel calling by giving the danger singal, and shall repeat same, if necessary. As soon as the exigency which prevented opening... | |
| Administrative law - 1978 - 992 pages
...under the bridge, if practicable, without signaling for the draw to open. (e) To bridge operators. (1) If the bridge can be opened, or is already open, when...promptly open the draw (except during closed periods, see paragraph (f)(l) of this section) or hold it open, as the case may be. (2) In case the draw cannot... | |
| Administrative law - 1975 - 1000 pages
...under the bridge, if practicable, without signaling for the draw to open. (e) To bridge operators. (1) If the bridge can be opened, or is already open, when...operator shall promptly answer the vessel calling toy giving the acknowledging signal and promptly open the draw (except during closed periods, see paragraph... | |
| Administrative law - 1980 - 1094 pages
...under the bridge, if practicable, without signaling for the draw to open. (e) To bridge operators. (1) If the bridge can be opened, or is already open, when a call signal is given, the operator shall prompt1¿ answer the vessel calling by giving the acknowledging signal and promptly open the draw (except... | |
| |