LE No. 8.—Showing the floor area, in square feet, of the various departments of the permanent shop buildings.

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

ABLE No. 9.-Showing contracts placed during fiscal year for material for permanent

shops.

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

TABLE NO. 9. Showing contracts placed during fiscal year for material for permaner

shops-Continued.

[blocks in formation]

Mitchell-Tappen Co.

JF. N. DuBois Co.

The Manhattan Supply Co..

Steel rolling doors for side and ends of Jas. G. Wilson Manufacturing Co.

building 3.

Fire doors...

[blocks in formation]
[blocks in formation]

494. 6,351.

109.

[blocks in formation]

Crouse Hinds Co.

Youngstown Sheet & Tube Co.

6,060.

National India Rubber Co.

National Electric Supply Co.

540.

1,479.

Transformers, switchboard, cable condult, etc.

General Electric Co.

4,182.

Crane Co..

24, 278.

F. Bissell Co..

124.5

Wheeler-Crocker Co...

695.0

Geo. C. Moon Co...

1,613.

Carroll Electric Co.

Standard Underground Cable Co..

660.0

265.7

[blocks in formation]

181.9

398.2

B. F. Sturtevant Co..

[blocks in formation]

LE NO. 9.-Showing contracts placed during fiscal year for material for permanent shops-Continued.

[blocks in formation]

TABLE No. 10. Showing old and new equipment installed in Balboa shops.

INSTALLATION OF MACHINES AND MOTORS.

255.84

544, 034. 43

[blocks in formation]

TABLE NO. 10.-Showing old and new equipment installed in Balboa shops-Continue

[blocks in formation]

COALING PLANTS, DRY-DOCKS, FLOATING CRANES, AND RADIO STATION

Design. Design and office work in connection with the dry-dock coaling plants, and floating cranes has been in immediate charge Civil Engineer F. H. Cooke, United States Navy, with a force engineers, draftsmen, and assistants numbering 18 at the end the fiscal year.

Coaling plants. As stated in the last annual report, proposa under circular 763 were opened in the Washington office June 14 1913, and were received on the Isthmus for canvass just prior to th close of the fiscal year 1913. These proposals were accompanied b plans, specifications, and other data. The five proposals receive are listed below:

[blocks in formation]

The circular specified general requirements only, and the proposal were therefore in the nature of competitive designs. Although a least two general arrangements were permitted by the circular for th Cristobal plant, all the submitted designs were based on the sam general layout, this consisting essentially of a pier structure inclosin the coal pile, the long sides of the pier being parallel to each othe and affording support for the unloading, stocking and reclaiming, and reloading units, deep water being provided on two sides and at on end of the pier structure. At Balboa, circular 763 admitted propo sals on two general designs, one known as "N," based on the provi sion of entirely new machinery throughout, the other known as "O," based on the utilization of the four berm cranes which were used fo mixing and placing concrete at the Pedro Miguel and Miraflore Locks. There were 19 items listed in the circular whereby the worl might be subdivided if advantageous; but for convenience as a gen eral indication of the prices received, the bids for Cristobal only, for Balboa plan "N" only, and for both complete are shown above. Bu

e bidder, Augustus Smith, submitted a proposal under plan "O," bid being $570,000 for this design, time of completion, both plants, th plan "O" Balboa, 34 months. The storage capacities of the ants as contemplated by circular 763 were as shown in the following

[blocks in formation]

The general plans accompanying circular 763 permitted enlargeents of both plants.

The proposals submitted were thoroughly compared, there being en into account not only the cost of purchase, operation, and intenance of the coal-handling machinery proper, together with e individual and combined capacities of the various units, but also e cost of the necessary substructures, and cost and amount of rease in storage capacity possible, the necessity for increase having come apparent during the period between the preparation of the rular and the receipt of proposals thereunder. As the result of the dy and comparison of the proposals, the following awards were ade, and two contracts, each dated August 19, 1913, were entered o for the prosecution of the work embraced thereunder, this work ng the designing, fabrication, delivery, and erection, each at its per location at Cristobal and Balboa on substructures and foundaas to be designed and furnished by the Government, of handling chinery and accessories for coaling plants, complete in all respects, ady for operation:

ustus Smith-Delivery for Cristobal plant to commence on or before reb. 19, 1914, and to be completed on or before Aug. 19, 1915; elivery for Balboa plant to commence on or before Feb. 19, 1914, and to be completed on or before Aug. 19, 1916:

2 duplex stocking and reclaiming bridges, for the Cristobal plant
only..

6 reloaders, 4 for the Cristobal plant and 2 for the Balboa plant..
2 conveying systems and power substations, each complete with all
accessories, including wharf bunker; 1 for Cristobal plant and 1
for the Balboa plant...............

Total contract price..

But Construction Co.-Erection of towers at Cristobal to begin on or before Sept. 19, 1914, and to be completed on or before Aug. 19, 1915; rection of towers at Balboa shall begin Mar. 19, 1915, and be completed on or before Feb. 19, 1916:

$425, 068. 00 266, 911. 00

654, 513.00

1,347, 392. 00

485, 736.00

6 unloader towers, 4 for the Cristobal plant and 2 for the Balboa plant...... These contracts were entered into with the understanding that the stobal plant would be enlarged by increasing its length to 1,700 et and its width to 308 feet, while the length of the Balboa plant is increased to 800 feet, the width remaining the same. The latter