Get this book in print
About this book
My library
Books on Google Play
Report of the governor of the Panama Canal-Continued.
Operation and maintenance of electric cargo-handling cranes___ 89
Miscellaneous___.
89
90
Division of municipal engineering--
Rising stem gate valve machines-Mechanical equipment.......
102
Rising stem gate valve machines-Electrical equipment_---
Operation.
Operation of rising stem gate valve machines under full head___
Monthly evaporation, Canal Zone, years 1913. 1914, and averages_
Tidal conditions, year 1913__
150
Monthly maximum, minimum, and mean elevations, Chagres River
and Gatun and Miraflores Lakes..
162
Principal freshets_____
163
Data on slopes of Chagres River and Gatun Lake during freshet
period of Nov. 10-11, 1913_--_-.
164
period of May 21-22, 1914---.
Report of the engineer of terminal construction-Continued.
Installation of mechanical division and shops-Continued.
Piping-
Weight of steel, date of acceptance, and contract payments-Bal-
boa shop buildings__.
Amount of tile erected on permanent shop buildings__
Amount of roof tile manufactured by American Cement Tile Co__
Amount of Barrett specification roofing erected in permanent
shop buildings
Horsepower of motors and their distribution in Balboa shop
buildings
Page.
172
173
174
Number and size of lights in Balboa shop buildings____
Calculated illumination in Balboa shop buildings_-_
175
Per cent completion of electrical installations, Balboa shop build-
ings.
176
Floor area, in square feet, of various departments of permanent
177
Contracts placed for material for permanent shops__-
Old and new equipment installed in Balboa shops-----
Coaling plants, dry docks, floating cranes, and radio stations--.
179
180