Congressional Serial SetU.S. Government Printing Office, 1911 - United States Reports, Documents, and Journals of the U.S. Senate and House of Representatives. |
From inside the book
Results 1-3 of 37
Page xviii
... Gatun, showing completed section of the main channel 500 feet wide, July, 1911. 8. Gatun Locks. Looking west, showing upper end of locks with Gatun dam and spillway walls in the distance, June 16, 1911. 9. Gatun LocLj. Looking north ...
... Gatun, showing completed section of the main channel 500 feet wide, July, 1911. 8. Gatun Locks. Looking west, showing upper end of locks with Gatun dam and spillway walls in the distance, June 16, 1911. 9. Gatun LocLj. Looking north ...
Page 119
... Dam and Spillway. [Maj. George M. Hoffman, resident engineer, In local charge.] GATUN DAM. [See Plate 102.] At the beginning of the fiscal year construction work had been extended to the full length of ... Gatun Dam and Spillway Gatun Dam.
... Dam and Spillway. [Maj. George M. Hoffman, resident engineer, In local charge.] GATUN DAM. [See Plate 102.] At the beginning of the fiscal year construction work had been extended to the full length of ... Gatun Dam and Spillway Gatun Dam.
Page 303
... Gatun locks 320 Gatun spillway 321 Pacific division — 322 Miraflores locks 322 Pedro Miguel locks 322 Table 5.— Dry filling- Atlantic division — Gatun dam 324 Gatun-Mindi levee 324 Gatun spillway — Backfilling 325 Gatun locks ...
... Gatun locks 320 Gatun spillway 321 Pacific division — 322 Miraflores locks 322 Pedro Miguel locks 322 Table 5.— Dry filling- Atlantic division — Gatun dam 324 Gatun-Mindi levee 324 Gatun spillway — Backfilling 325 Gatun locks ...
Contents
Report of the chairman and chief engineer | 1 |
Report of the chairman and chief engineerContinued Page | 57 |
APPENDIX | 65 |
23 other sections not shown
Other editions - View all
Common terms and phrases
addition Ancon April Atlantic division Back fill Balboa barges caisson canal prism Canal Zone cars cent completed central division Chagres River chain channel charge chief engineer Cocoli connection construction Cristobal cubic yards Culebra Cut culvert density district division cost division engineer dredges drills dry fill dump east elevation ended June 30 equipment erection excavation February fiscal year ending Gamboa Gatun Dam Gatun Lake Gatun Locks Gorgona guard gates handled hour hydraulic fill inches installed Isthmian Canal Commission Isthmus January July June 30 labor linear feet locomotives lower lock machines March miles Miraflores Locks mixers month operation output Pacific division Panama Railroad Pedro Miguel Locks pipe placed Porto Bello pressure pumping relocation removed repairs reservoir rock sand September side slides spillway station steam shovels steel suction dredges tion Toro Point total amount total number track trestle upper lock valves wall yards of material