Congressional Serial SetU.S. Government Printing Office, 1911 - United States Reports, Documents, and Journals of the U.S. Senate and House of Representatives. |
From inside the book
Results 1-3 of 78
Page 306
Exhibit A. — Statement of Construction Expenditures to June 30, 1911 — Con. Table L. — Statement of construction expenditures to June 30, 1911 — Continued- ATLANTIC DIVISION— Continued. i Linear feet. ExHrBit A. — Statement of ...
Exhibit A. — Statement of Construction Expenditures to June 30, 1911 — Con. Table L. — Statement of construction expenditures to June 30, 1911 — Continued- ATLANTIC DIVISION— Continued. i Linear feet. ExHrBit A. — Statement of ...
Page 310
... June SO, 1911 — Continued. PACIFIC DIVISJON— Continued. Exhibit A. — Statement of Construction Expenditures to June 30 ... June 30, 1909 108,843.27 143,491.51 233,495.82 8,190.96 3,834.93 21,544.57 117,034.23 147,326.44 255,040.39 Fiscal year ...
... June SO, 1911 — Continued. PACIFIC DIVISJON— Continued. Exhibit A. — Statement of Construction Expenditures to June 30 ... June 30, 1909 108,843.27 143,491.51 233,495.82 8,190.96 3,834.93 21,544.57 117,034.23 147,326.44 255,040.39 Fiscal year ...
Page 432
... June 30, 1911. Table 2. — Letters and pan-els registered, by offices, during the fiscal year ended June 30, 1911. Table 3. — Number of dispatches of mail from the exchange office at Cristobal and number of pouches, sacks, and registered ...
... June 30, 1911. Table 2. — Letters and pan-els registered, by offices, during the fiscal year ended June 30, 1911. Table 3. — Number of dispatches of mail from the exchange office at Cristobal and number of pouches, sacks, and registered ...
Contents
Report of the chairman and chief engineer | 1 |
Report of the chairman and chief engineerContinued Page | 57 |
APPENDIX | 65 |
23 other sections not shown
Other editions - View all
Common terms and phrases
addition Ancon April Atlantic division Back fill Balboa barges caisson canal prism Canal Zone cars cent completed central division Chagres River chain channel charge chief engineer Cocoli connection construction Cristobal cubic yards Culebra Cut culvert density district division cost division engineer dredges drills dry fill dump east elevation ended June 30 equipment erection excavation February fiscal year ending Gamboa Gatun Dam Gatun Lake Gatun Locks Gorgona guard gates handled hour hydraulic fill inches installed Isthmian Canal Commission Isthmus January July June 30 labor linear feet locomotives lower lock machines March miles Miraflores Locks mixers month operation output Pacific division Panama Railroad Pedro Miguel Locks pipe placed Porto Bello pressure pumping relocation removed repairs reservoir rock sand September side slides spillway station steam shovels steel suction dredges tion Toro Point total amount total number track trestle upper lock valves wall yards of material