Congressional Serial SetU.S. Government Printing Office, 1911 - United States Reports, Documents, and Journals of the U.S. Senate and House of Representatives. |
From inside the book
Results 1-3 of 24
Page 9
... barges, whence it was transferred to the stock piles; the cost per cubic yard delivered in the stock piles at Gatun amounted to $2.3403 per cubic yard. The Porto Bello quarry is also to supply rock needed for the outer stone or armor of ...
... barges, whence it was transferred to the stock piles; the cost per cubic yard delivered in the stock piles at Gatun amounted to $2.3403 per cubic yard. The Porto Bello quarry is also to supply rock needed for the outer stone or armor of ...
Page 112
... barges, and carried about 31,350 passengers. Two mud scows which had been converted into stone barges were returned to the dredging service. During the storm on December 3 barge A7o. 7, loaded with crushed rock, broke away from the tow ...
... barges, and carried about 31,350 passengers. Two mud scows which had been converted into stone barges were returned to the dredging service. During the storm on December 3 barge A7o. 7, loaded with crushed rock, broke away from the tow ...
Page 190
... barges as proposed at the outset, as numerous bowlders and sunken logs were encountered, and rock requiring blasting was found at a higher elevation than indicated by the borings; these not only prevented the barges from settling but ...
... barges as proposed at the outset, as numerous bowlders and sunken logs were encountered, and rock requiring blasting was found at a higher elevation than indicated by the borings; these not only prevented the barges from settling but ...
Contents
Report of the chairman and chief engineer | 1 |
Report of the chairman and chief engineerContinued Page | 57 |
APPENDIX | 65 |
23 other sections not shown
Other editions - View all
Common terms and phrases
addition Ancon April Atlantic division Back fill Balboa barges caisson canal prism Canal Zone cars cent completed central division Chagres River chain channel charge chief engineer Cocoli connection construction Cristobal cubic yards Culebra Cut culvert density district division cost division engineer dredges drills dry fill dump east elevation ended June 30 equipment erection excavation February fiscal year ending Gamboa Gatun Dam Gatun Lake Gatun Locks Gorgona guard gates handled hour hydraulic fill inches installed Isthmian Canal Commission Isthmus January July June 30 labor linear feet locomotives lower lock machines March miles Miraflores Locks mixers month operation output Pacific division Panama Railroad Pedro Miguel Locks pipe placed Porto Bello pressure pumping relocation removed repairs reservoir rock sand September side slides spillway station steam shovels steel suction dredges tion Toro Point total amount total number track trestle upper lock valves wall yards of material