Page 24
... cubic yards, at a cost of $4.6826 per cubic yard. The partly completed construction plant placed 67,678 cubic yards, and the remaining 205,255 cubic yards were supplied by the auxiliary plant. The average number of mixers of the ...
... cubic yards, at a cost of $4.6826 per cubic yard. The partly completed construction plant placed 67,678 cubic yards, and the remaining 205,255 cubic yards were supplied by the auxiliary plant. The average number of mixers of the ...
Page 25
amount crushed 808,767 cubic yards were for use in the locks ; 35,382 cubic yards were used for work in the division other than the locks, of which 16,505 cubic yards were for municipal work, and 11,675 cubic yards were supplied to ...
amount crushed 808,767 cubic yards were for use in the locks ; 35,382 cubic yards were used for work in the division other than the locks, of which 16,505 cubic yards were for municipal work, and 11,675 cubic yards were supplied to ...
Page 292
$0.2699 per cubic yard; Pacific division, prism, 197,677 cubic yards, average division cost $0.6106 per cubic yard; Miraflores locks, 332,703 cubic yards, average division cost $0.5486 per cubic yard. This work in the Atlantic division ...
$0.2699 per cubic yard; Pacific division, prism, 197,677 cubic yards, average division cost $0.6106 per cubic yard; Miraflores locks, 332,703 cubic yards, average division cost $0.5486 per cubic yard. This work in the Atlantic division ...
Contents
Report of the chairman and chief engineer | 1 |
Report of the chairman and chief engineerContinued Page | 57 |
APPENDIX | 65 |
23 other sections not shown
Other editions - View all
Common terms and phrases
addition Ancon April Atlantic division Back fill Balboa barges caisson canal prism Canal Zone cars cent completed central division Chagres River chain channel charge chief engineer Cocoli connection construction Cristobal cubic yards Culebra Cut culvert density district division cost division engineer dredges drills dry fill dump east elevation ended June 30 equipment erection excavation February fiscal year ending Gamboa Gatun Dam Gatun Lake Gatun Locks Gorgona guard gates handled hour hydraulic fill inches installed Isthmian Canal Commission Isthmus January July June 30 labor linear feet locomotives lower lock machines March miles Miraflores Locks mixers month operation output Pacific division Panama Railroad Pedro Miguel Locks pipe placed Porto Bello pressure pumping relocation removed repairs reservoir rock sand September side slides spillway station steam shovels steel suction dredges tion Toro Point total amount total number track trestle upper lock valves wall yards of material