Congressional Serial SetU.S. Government Printing Office, 1911 - United States Reports, Documents, and Journals of the U.S. Senate and House of Representatives. |
From inside the book
Results 1-3 of 72
Page 157
... district — locks, dams, and dry excavation; second district — dredging, Balboa shops, and ship ways; third district — municipal and sanitary engineering; fourth district- — Ancon quarry and crushers; fifth district — hydraulic ...
... district — locks, dams, and dry excavation; second district — dredging, Balboa shops, and ship ways; third district — municipal and sanitary engineering; fourth district- — Ancon quarry and crushers; fifth district — hydraulic ...
Page 180
... district Miraflores district Corozal district Ancon district Hal boa district East Balboa district Total 10,831.51 A detailed statement of the construction work performed during the year is given in Table 28. Table 28. — Zone waterworks ...
... district Miraflores district Corozal district Ancon district Hal boa district East Balboa district Total 10,831.51 A detailed statement of the construction work performed during the year is given in Table 28. Table 28. — Zone waterworks ...
Page 433
... district court of the district of Ancon. Table 47. — Business transacted in the district court of the district of Empire. Table 48. — Business transacted in the district court of the district of Gorgona. Table 49. — Business transacted ...
... district court of the district of Ancon. Table 47. — Business transacted in the district court of the district of Empire. Table 48. — Business transacted in the district court of the district of Gorgona. Table 49. — Business transacted ...
Contents
Report of the chairman and chief engineer | 1 |
Report of the chairman and chief engineerContinued Page | 57 |
APPENDIX | 65 |
23 other sections not shown
Other editions - View all
Common terms and phrases
addition Ancon April Atlantic division Back fill Balboa barges caisson canal prism Canal Zone cars cent completed central division Chagres River chain channel charge chief engineer Cocoli connection construction Cristobal cubic yards Culebra Cut culvert density district division cost division engineer dredges drills dry fill dump east elevation ended June 30 equipment erection excavation February fiscal year ending Gamboa Gatun Dam Gatun Lake Gatun Locks Gorgona guard gates handled hour hydraulic fill inches installed Isthmian Canal Commission Isthmus January July June 30 labor linear feet locomotives lower lock machines March miles Miraflores Locks mixers month operation output Pacific division Panama Railroad Pedro Miguel Locks pipe placed Porto Bello pressure pumping relocation removed repairs reservoir rock sand September side slides spillway station steam shovels steel suction dredges tion Toro Point total amount total number track trestle upper lock valves wall yards of material