Congressional Serial SetU.S. Government Printing Office, 1911 - United States Reports, Documents, and Journals of the U.S. Senate and House of Representatives. |
From inside the book
Results 1-3 of 89
Page 290
division cost (including plant and equipment) and overhead expenses, the total by divisions being as follows : Divisions. Atlantic... Central Pacific Total It will be seen that the division of general expenses has resulted in a ...
division cost (including plant and equipment) and overhead expenses, the total by divisions being as follows : Divisions. Atlantic... Central Pacific Total It will be seen that the division of general expenses has resulted in a ...
Page 291
... expenses of this dumping, while the central division had long hauls to their dumps and nearly all expenses for dumping are included in their cost, it will be seen that the latter division produced by far the lowest cost. During the ...
... expenses of this dumping, while the central division had long hauls to their dumps and nearly all expenses for dumping are included in their cost, it will be seen that the latter division produced by far the lowest cost. During the ...
Page 292
$0.2699 per cubic yard; Pacific division, prism, 197,677 cubic yards, average division cost $0.6106 per cubic yard; Miraflores locks, 332,703 cubic yards, average division cost $0.5486 per cubic yard. This work in the Atlantic division ...
$0.2699 per cubic yard; Pacific division, prism, 197,677 cubic yards, average division cost $0.6106 per cubic yard; Miraflores locks, 332,703 cubic yards, average division cost $0.5486 per cubic yard. This work in the Atlantic division ...
Contents
Report of the chairman and chief engineer | 1 |
Report of the chairman and chief engineerContinued Page | 57 |
APPENDIX | 65 |
23 other sections not shown
Other editions - View all
Common terms and phrases
addition Ancon April Atlantic division Back fill Balboa barges caisson canal prism Canal Zone cars cent completed central division Chagres River chain channel charge chief engineer Cocoli connection construction Cristobal cubic yards Culebra Cut culvert density district division cost division engineer dredges drills dry fill dump east elevation ended June 30 equipment erection excavation February fiscal year ending Gamboa Gatun Dam Gatun Lake Gatun Locks Gorgona guard gates handled hour hydraulic fill inches installed Isthmian Canal Commission Isthmus January July June 30 labor linear feet locomotives lower lock machines March miles Miraflores Locks mixers month operation output Pacific division Panama Railroad Pedro Miguel Locks pipe placed Porto Bello pressure pumping relocation removed repairs reservoir rock sand September side slides spillway station steam shovels steel suction dredges tion Toro Point total amount total number track trestle upper lock valves wall yards of material