... ENGINEERS, UNITED STATES ARMY, MEMBER OF ISTHMIAN CANAL COMMISSION, DIVISION ENGINEER, ATLANTIC DIVISION. Isthmian Canal Commission, Department of Construction and Engineering, Atlantic Division, Office of Division Engineer, Gatun ...
... ENGINEERS, UNITED STATES ARMY, MEMBER OF ISTHMIAN CANAL COMMISSION, DIVISION ENGINEER, ATLANTIC DIVISION. Isthmian Canal Commission, Department of Construction and Engineering, Atlantic Division, Office of Division Engineer, Gatun ...
Page 133
... DIVISION ENGINEER, CENTRAL DIVISION. Isthmian Canal Commission, Office of Division Engineer, Central Division, Empire, Canal Zone, August 8, 1911. Sir: I have the honor to submit the following report of operations in the central division ...
... DIVISION ENGINEER, CENTRAL DIVISION. Isthmian Canal Commission, Office of Division Engineer, Central Division, Empire, Canal Zone, August 8, 1911. Sir: I have the honor to submit the following report of operations in the central division ...
Page 217
... engineer in charge of the drafting room, drawings, and old French records in the chief engineer's office. Mr. James ... division, he was appointed traveling engineer and inspector. All officers and employees have performed their work in ...
... engineer in charge of the drafting room, drawings, and old French records in the chief engineer's office. Mr. James ... division, he was appointed traveling engineer and inspector. All officers and employees have performed their work in ...
Contents
Report of the chairman and chief engineer | 1 |
Report of the chairman and chief engineerContinued Page | 57 |
APPENDIX | 65 |
23 other sections not shown
Other editions - View all
Common terms and phrases
addition Ancon April Atlantic division Back fill Balboa barges caisson canal prism Canal Zone cars cent completed central division Chagres River chain channel charge chief engineer Cocoli connection construction Cristobal cubic yards Culebra Cut culvert density district division cost division engineer dredges drills dry fill dump east elevation ended June 30 equipment erection excavation February fiscal year ending Gamboa Gatun Dam Gatun Lake Gatun Locks Gorgona guard gates handled hour hydraulic fill inches installed Isthmian Canal Commission Isthmus January July June 30 labor linear feet locomotives lower lock machines March miles Miraflores Locks mixers month operation output Pacific division Panama Railroad Pedro Miguel Locks pipe placed Porto Bello pressure pumping relocation removed repairs reservoir rock sand September side slides spillway station steam shovels steel suction dredges tion Toro Point total amount total number track trestle upper lock valves wall yards of material