Page 176
... installed, as may be seen from the following statement : Table 23. — Water consumption from Culebra (included) south. Fiscal year— 1905 i 1906 ' 1907 ' 190S. 1909. 1910. 1911. 1 Water first turned into main to Ancon June 26, 1905. and ...
... installed, as may be seen from the following statement : Table 23. — Water consumption from Culebra (included) south. Fiscal year— 1905 i 1906 ' 1907 ' 190S. 1909. 1910. 1911. 1 Water first turned into main to Ancon June 26, 1905. and ...
Page 181
... Installing 4-inch main and erecting water trough: Excavation 35 cubic yards. Back All do Handling material Laying 4-inch cast-iron pipe 1% linear feet . Building trough and repairing spring Total. Connections to houses Nos. 54 and 55 ...
... Installing 4-inch main and erecting water trough: Excavation 35 cubic yards. Back All do Handling material Laying 4-inch cast-iron pipe 1% linear feet . Building trough and repairing spring Total. Connections to houses Nos. 54 and 55 ...
Page 182
... Installing 3-inch main to hydraulic plant: Excavation I 78 cubic vards... 2,015 linear feet.. Laying 3- inch galvanized-iron pipe. . Handling material. Total. Installing 10-inch black-iron water line: Excavation 81 cubic yards ...
... Installing 3-inch main to hydraulic plant: Excavation I 78 cubic vards... 2,015 linear feet.. Laying 3- inch galvanized-iron pipe. . Handling material. Total. Installing 10-inch black-iron water line: Excavation 81 cubic yards ...
Contents
Report of the chairman and chief engineer | 1 |
Report of the chairman and chief engineerContinued Page | 57 |
APPENDIX | 65 |
23 other sections not shown
Other editions - View all
Common terms and phrases
addition Ancon April Atlantic division Back fill Balboa barges caisson canal prism Canal Zone cars cent completed central division Chagres River chain channel charge chief engineer Cocoli connection construction Cristobal cubic yards Culebra Cut culvert density district division cost division engineer dredges drills dry fill dump east elevation ended June 30 equipment erection excavation February fiscal year ending Gamboa Gatun Dam Gatun Lake Gatun Locks Gorgona guard gates handled hour hydraulic fill inches installed Isthmian Canal Commission Isthmus January July June 30 labor linear feet locomotives lower lock machines March miles Miraflores Locks mixers month operation output Pacific division Panama Railroad Pedro Miguel Locks pipe placed Porto Bello pressure pumping relocation removed repairs reservoir rock sand September side slides spillway station steam shovels steel suction dredges tion Toro Point total amount total number track trestle upper lock valves wall yards of material