... placed so as to build sufficient of the ogee of the dam to bring it above high water. Subsequently two additional small cofferdams were constructed for placing concrete of the dam just outside of the channel flow. After the beginning of ...
... placed so as to build sufficient of the ogee of the dam to bring it above high water. Subsequently two additional small cofferdams were constructed for placing concrete of the dam just outside of the channel flow. After the beginning of ...
Page 161
... placed it in the forms. In the above tables the amount of concrete handled by the two types of cranes does not agree, as some of the berm cranes' output was placed by derricks and the chamber cranes placed a portion of the concrete ...
... placed it in the forms. In the above tables the amount of concrete handled by the two types of cranes does not agree, as some of the berm cranes' output was placed by derricks and the chamber cranes placed a portion of the concrete ...
Page 294
... placed in the various projects and the average division cost thereof per cubic yard were: The largest quantity placed in Gatun Dam in any one month was in November, when 266,105 cubic yards were placed at an average division cost of ...
... placed in the various projects and the average division cost thereof per cubic yard were: The largest quantity placed in Gatun Dam in any one month was in November, when 266,105 cubic yards were placed at an average division cost of ...
Contents
Report of the chairman and chief engineer | 1 |
Report of the chairman and chief engineerContinued Page | 57 |
APPENDIX | 65 |
23 other sections not shown
Other editions - View all
Common terms and phrases
addition Ancon April Atlantic division Back fill Balboa barges caisson canal prism Canal Zone cars cent completed central division Chagres River chain channel charge chief engineer Cocoli connection construction Cristobal cubic yards Culebra Cut culvert density district division cost division engineer dredges drills dry fill dump east elevation ended June 30 equipment erection excavation February fiscal year ending Gamboa Gatun Dam Gatun Lake Gatun Locks Gorgona guard gates handled hour hydraulic fill inches installed Isthmian Canal Commission Isthmus January July June 30 labor linear feet locomotives lower lock machines March miles Miraflores Locks mixers month operation output Pacific division Panama Railroad Pedro Miguel Locks pipe placed Porto Bello pressure pumping relocation removed repairs reservoir rock sand September side slides spillway station steam shovels steel suction dredges tion Toro Point total amount total number track trestle upper lock valves wall yards of material