Congressional Serial SetU.S. Government Printing Office, 1911 - United States Reports, Documents, and Journals of the U.S. Senate and House of Representatives. |
From inside the book
Results 1-3 of 67
Page 82
... station on the Gatun Dam and an alternative generating station at Miraflores, the latter to be operated by steam and to be used only in case of accident to the hydroelectric generating station. The two stations will be connected by a ...
... station on the Gatun Dam and an alternative generating station at Miraflores, the latter to be operated by steam and to be used only in case of accident to the hydroelectric generating station. The two stations will be connected by a ...
Page 248
stations are also maintained at Ancon, Cristobal, Rio Grande Reservoir, and Brazos Brook Reservoir. An automatic tide register was installed in the canal at station 2,155 opposite Corozal, in addition to those previously in operation at ...
stations are also maintained at Ancon, Cristobal, Rio Grande Reservoir, and Brazos Brook Reservoir. An automatic tide register was installed in the canal at station 2,155 opposite Corozal, in addition to those previously in operation at ...
Page 266
... station has had charge of gaugings on the upper and lower tributaries, including the Pequeni, Chagres (proper), La Puente, Gatuncillo, Chilibre, and the Aguardiente, these measurements being made weekly when possible. Discharge ...
... station has had charge of gaugings on the upper and lower tributaries, including the Pequeni, Chagres (proper), La Puente, Gatuncillo, Chilibre, and the Aguardiente, these measurements being made weekly when possible. Discharge ...
Contents
Report of the chairman and chief engineer | 1 |
Report of the chairman and chief engineerContinued Page | 57 |
APPENDIX | 65 |
23 other sections not shown
Other editions - View all
Common terms and phrases
addition Ancon April Atlantic division Back fill Balboa barges caisson canal prism Canal Zone cars cent completed central division Chagres River chain channel charge chief engineer Cocoli connection construction Cristobal cubic yards Culebra Cut culvert density district division cost division engineer dredges drills dry fill dump east elevation ended June 30 equipment erection excavation February fiscal year ending Gamboa Gatun Dam Gatun Lake Gatun Locks Gorgona guard gates handled hour hydraulic fill inches installed Isthmian Canal Commission Isthmus January July June 30 labor linear feet locomotives lower lock machines March miles Miraflores Locks mixers month operation output Pacific division Panama Railroad Pedro Miguel Locks pipe placed Porto Bello pressure pumping relocation removed repairs reservoir rock sand September side slides spillway station steam shovels steel suction dredges tion Toro Point total amount total number track trestle upper lock valves wall yards of material